Construction management in Kenya at Aalis Studios is the work of controlling budget, programme, quality and approvals on a site, whether the building is a house or a commercial project.
What construction management covers
Construction management in Kenya, as Aalis Studios provides it, is the management of a build: the budget, the programme, procurement, quality and the approvals that have to stay in step with the site. It is not the same offer as the studio's construction company in Nairobi page, and it is not the same offer as design-build in Kenya. Those pages stay up because they describe a contractor role and a combined design-and-build role. This page is the managing and supervising service. If you already have a contractor, you can still appoint the studio to manage and report. If you want one team to design and build, use the design-build page and read this one for how the site is controlled.
Budget control means the cost you approved is the cost the site is measured against. A variation is written, priced and accepted before it is built. Programme means the order of trades is agreed, so a finish is not ordered for a room that has no roof. Procurement means materials are specified and compared, not swapped on site for whatever is in the yard. Quality means the work is checked against the drawings. Approvals mean the county set and the built work stay aligned.

Residential construction management
On a house, construction supervision in Kenya is personal. The owner feels every change in the kitchen and every week the roof is late. Residential management keeps a single cost report, a programme you can read, and photographs that match the report. The permits that sit under that topic are covered on the building permits and approvals page, which is the document trail a house needs before and during the build.
A homeowner should expect to be asked for decisions early: tiles, windows, stair finishes, kitchen layout. Late decisions are how residential sites lose weeks. The manager's job is to ask before the trade arrives, not after the work has been guessed.
Commercial construction management
A commercial site adds tenants, a longer approval chain and a fit-out that may be a separate contract from the shell. Commercial construction management in Nairobi is the page for that scope. Cost control on a block or a fit-out is detailed on construction cost management in Kenya.
Commercial programmes fail in the gaps between packages: the shell is late, the joinery was measured too early, the landlord's rules arrive after the ceiling is closed. Management is the job of keeping those packages in one programme and one cost report.
Supervision and reporting
Supervision without a report is a visit you cannot check. The report should say what happened on site, what it cost, what is next, and what you need to decide. Site photographs belong to the same date as the report, so you can see the wall the sentence describes. Valuations, where they are part of the appointment, measure completed work against the contract sum before a certificate is recommended.
Weekly is a common rhythm on an active site, but this page does not promise a named weekday for every project. The rhythm is agreed in the appointment. What is not optional is a written record. A phone call that is not followed by a note will be remembered differently by the owner and the site.
Design-build option
Design-build puts design and construction under one agreement. Some clients want that because there is one programme and one place to ask a question. Others want an independent manager because they already have a contractor, or because they want the person checking the work to be separate from the person doing it. Both are legitimate. Read design-build in Kenya for the combined service, and keep this page as the description of management and supervision. The studio will say which appointment you are being offered before you pay for it.
Working with owners abroad
Owners outside Kenya use the same reports, plus a scheduled call. Remote construction management is written for that distance. You should still be approving variations yourself. A manager can recommend. The owner authorises the spend. Payments are staged against the report, in Kenyan shillings.
If you are abroad, agree who can instruct the site when you are asleep. An open instruction to "use your judgement" is how a finish changes without you. Limit that authority in writing, and keep a list of choices that must wait for you.
How we price the service
A construction management fee is scoped to the project. This page does not publish a standalone percentage, because a figure that ignores the contract sum, the duration and the level of reporting would be a guess. The architect fees in Kenya page is the place for published fee structure. A BOQ generator helps you see quantities. The construction cost per square metre guide is the published context for build cost, not the fee for management.
The fee, whatever the structure, is agreed before the site starts, and it is stated separately from the construction cost. VAT is excluded unless the agreement says it is included. You should be able to point at the management fee and at the build cost as two different numbers.
Aalis Studios is an award-winning architecture and interior design studio in Nairobi, Kenya, and a Lexus Design Award winner. The studio has completed 100+ architecture and design projects. Registered professionals on the team prepare, print and sign off architectural and structural drawings ready for county submission. The principal architect is Arch. Vincent Abuya, BORAQS Reg. No. A1867.
Related
FAQ
What is construction management, as opposed to being the contractor?
Management controls the budget, programme, quality and reporting. A contractor carries out the building work. Aalis Studios publishes those roles on separate pages so the appointment is clear.
Do you supervise houses and commercial sites?
Yes. Residential supervision and commercial construction management are both described here, with commercial cost control on its own child page. The residential management child page is not linked while it still returns not found.
Will I get written site reports?
Yes. A report should state what happened, what it cost, what is next, and what you need to decide, with photographs from the same date. The reporting day is agreed in the appointment.
How is construction management priced?
The fee is scoped to the project and agreed before the site starts, separately from the construction cost. A standalone percentage is not published on this page. VAT is excluded unless the agreement includes it.
Can you manage a site for an owner who lives abroad?
Yes. Remote construction management uses the same reports plus a scheduled call. You still approve variations and staged payments yourself.
Book a Project Exploration Session
Start with a free 10-minute fit call. A 1-hour Project Exploration Session is KES 20,000 and a 2-hour session is KES 35,000, VAT excluded. The session fee is credited against design fees within 90 days. You can cancel free of charge up to 24 hours before the session.
Book a Project Exploration Session or contact the studio. WhatsApp +254 757 743 454. Email hello@aalisstudios.com.